
Set an antenna over a mark
Center the antenna over the survey mark, then note its height and model before logging satellite signals.
Career profile
Geodetic surveyors fix survey marks across large regions in one frame fitted to Earth's curve.
Readings miles apart have to fit together as one set. Geodetic surveyors help by setting dependable anchor points that maps and engineering work rely on.


Center the antenna over the survey mark, then note its height and model before logging satellite signals.

Work out coordinates for a linked network of marks so every project reading rests on one steady base.

Compare repeat readings, and if they do not meet project precision, review the setup and schedule a remeasure.

Enter coordinates, mark descriptions and quality-check results in the survey database for others to understand and use later.
United States · 2026
United States · May 2025
United States · 2025–2035
Quick orientation
Typical preparation; substantial practical learning also matters.
$36.27 an hour for all surveyors. Pay is not reported separately for geodetic surveyors.
Projected for all surveyors, 2025–2035; no separate geodetic projection is reported.
The Online Positioning User Service (OPUS) can turn survey-grade satellite observations into coordinates tied to the national reference system.
You check the antenna information and whether the results are usable. Software cannot detect every incorrect input.
How much checking future tools can take over remains uncertain, especially when poor observations and setup mistakes produce plausible results.
Pay in context
Geodetic-surveyor pay is not reported separately. The national figures below cover all surveyors.
In May 2025, the median was $75,440 a year, or $36.27 an hour. The 10th-percentile wage was $46,880 and the 90th-percentile wage was $125,590. Those are positions in the wage distribution, not starting and senior salaries.
Employment is projected to grow 5.8% from 2025 to 2035, with about 3,100 openings annually across all surveyors. Openings include replacement needs as well as growth.
Build both the mathematics and the measurement skills. Look for study or work that includes geodetic control and coordinate calculations.
After entry
This starts where the entry routes leave off: early work, growing capability, and advancement or specialization. This path also has a credential or licensing boundary; see the requirements and limits.
Get consistent with antenna records, repeat observations and reviewing processing reports.
Develop the judgment to reconcile measurements and work between coordinate systems.
Plan crew work, advise on measurement methods and train others to check results.
Federal field projects can support airport charts and coastal mapping. You work where observations are needed, with equipment logistics, weather and travel shaping the day.
At the National Geodetic Survey, office teams maintain the network of continuously operating reference stations and guide field projects. The emphasis is keeping shared positioning data usable across many projects.
Try it
On graph paper, mark three points. Give their coordinates from the lower-left corner, then move the origin two squares right and recalculate. Explain why the numbers changed although the points did not. See whether sorting out reference systems interests you.